Thursday, November 22, 2012

Pictures from prep work

barnacles-note how thin the blue bottom paint had gotten

adding insulation to fridge, it is now much more efficient-saves battery use

paint booth David & Chris built

painting the hull

making the new v-berth mattresses thank goodness for enough floor space to lay out the pieces

the patio was for varnishing removeable pieces

varnishing the cabin-note lights hanging down- prep work is way more time consuming than the actual varnish work

varnish in the head

all packed and ready to go

living small

v-berth with new mattress and sheets-sorry I can't turn it around

Sanctuary coming out

moving to the paint spot
I found the disc with some pictures of our preparations for the trip.  Even on a small boat, it's easy to lose things.

No comments:

Post a Comment